Skip to main content
  1. Others/

APPROVAL FOR DEEP TUBE-WELL

Approval for a deep tube-well is the official endorsement granted by regulatory bodies for the construction and operation of a groundwater extraction system. This process involves evaluating technical feasibility, environmental impact, and compliance with water resource regulations. The approval ensures sustainable water supply for various purposes, from agricultural to industrial, while safeguarding groundwater resources and maintaining ecological balance within the prescribed legal framework.

Issuing Authority

Office: Dhaka Water Supply and Sewerage Authority

Address: WASA Bhaban, 98 Kazi Nazrul Islam Avenue, Kawran Bazar, Dhaka

Email: md@dwasa.org.bd; secretary@dwasa.org.bd

Website: www.dwasa.org.bd**

Required list of all documents

  1. Land Deed /mutation /Rent
  2. City Tax
  3. Plot description, recorded in City Corporation or RAJUK [Original copy duly attested by First-Class gazette officer]
  4. Water bill [If needed]

Step by step all process

Step 1 Application form collection & submission: Applicant collects the information, application form, and relevant documents from the concerned office, and submits them to the dispatch section.

Step 2 Initial Checking and Review: Upon submission, the dispatch section verifies the application and documents for completeness and basic requirements. The Managing Director then reviews the application for initial suitability before forwarding it to the Chief Engineer. The Chief Engineer evaluates technical aspects and arranges a meeting for further discussion, ensuring thorough initial review.

Step 3 Recommendation and Approval Process: After initial checks and detailed evaluation, the Executive Committee reviews the application. It then goes to the Environment and Monitoring Department for environmental assessment validated by the GIS cell. The department provides a recommendation based on these assessments. The Managing Director grants final approval upon receiving the recommendation, and the Environment and Monitoring Department issues a demand note detailing fees for the applicant.

Step 4 Final approval: After deposits the fees to the bank and submits the receipt to the concerned department. Applicant obtains the approval, completing the process.

Free schedule ** For residential use:**

  • 2 inch. Pipe Fees BDT 80000

For Industrial/commercial purposes:

  • 2 inch. Pipe Fees BDT 1,50,000
  • Meter charge BDT 13,000

Official time limit

Time may vary

Actual time limit

Renewal process

Required list of all documents

  1. Money Receipt [Original]

Step by step all process

Step 1: Submit the renewal fees

Free schedule

For residential use :

2 inch. Pipe Fees BDT 50000

For Industrial/commercial purposes:

2 inch. Pipe Fees BDT 1,00,000

Official time limit

Time may vary

Actual time limit